EV infrastructure grant for landlords: up to £30,000 per site.

Private landlords and housing providers can claim 75% of EV charger installation costs through the OZEV EV Infrastructure Grant, capped at £600 per socket and £30,000 per site. Here is what qualifies and how to apply.
Get your free quote
Takes 2 mins
Grant rate
75% of costs
Per socket cap
£600
Per site cap
£30,000

What is the EV Infrastructure Grant for Landlords?

The EV Infrastructure Grant for Landlords and Housing Providers is an OZEV (Office for Zero Emission Vehicles) scheme that funds EV charging infrastructure at residential rental properties. It was introduced to address the gap left by the homeowner grant — which was discontinued in 2022 — and to make EV charging accessible to tenants who cannot install chargers themselves.

Unlike the per-tenant OZEV EV Chargepoint Grant (up to £500 for eligible renters), the landlord scheme covers the shared infrastructure: the cabling, distribution boards, and chargepoints that serve multiple units or parking spaces at a single site. It is specifically for property owners, not individual tenants.

The grant is applied for by your installer. Landlords do not submit grant applications directly to OZEV. The OZEV-authorised installer applies on your behalf and deducts the grant from the final invoice. You pay the difference.

Who can claim the grant?

The EV Infrastructure Grant for Landlords is open to:

Applicant typeEligible?
Private landlords (residential rental properties)Yes
Housing associationsYes
Social housing providersYes
Local authority housingYes — check with your installer
Commercial property owners (offices, retail)No — use the Workplace Charging Scheme instead
Homeowners (non-rental, own residence)No — the homeowner grant ended in 2022
Holiday let operatorsNo — property must be a residential tenancy

There is no minimum number of properties or sockets. A landlord with a single buy-to-let flat and one parking space can apply. The grant applies per site: a block of flats with shared parking counts as one site.

How much can you claim?

The grant covers 75% of eligible costs, with two caps:

  • £600 per socket — applies to each individual charge point socket
  • £30,000 per site — the maximum total grant for any single property address or connected site

For a landlord installing 10 sockets at a site, the maximum grant is 10 × £600 = £6,000, as long as 75% of the total project cost is at least £6,000. The site cap of £30,000 is only relevant for large developments (50 sockets or more).

ScenarioEligible cost (supply + install)75% grantLandlord pays
1 socket, single house£1,200£600 (hit per-socket cap)£600
4 sockets, small block of flats£4,800£2,400£2,400
20 sockets, housing association block£24,000£12,000£12,000

What costs are eligible?

The grant covers both the chargepoints and the associated electrical infrastructure required to install them:

  • EV chargepoint hardware (the wallbox or socket unit itself)
  • Electrical cable routes from the distribution board to the parking area
  • Distribution board upgrades or additions needed for the EV circuits
  • Earthing and protective bonding
  • Groundworks for underground cable routes (up to reasonable limits)
  • Installation labour by an OZEV-authorised installer

Costs that are not eligible:

  • Structural modifications to buildings
  • Decoration or making good beyond what the cable route requires
  • Ongoing maintenance contracts
  • Smart charging management software (the hardware must include smart capability; the software subscription is excluded)
Chargepoints must be smart chargers. All chargepoints funded under this grant must comply with the Electric Vehicles (Smart Charge Points) Regulations 2021. This means they must include demand-side response capability — essentially the ability to schedule and adjust charge timing remotely. Standard smart chargers (Pod Point, Hypervolt, Ohme, Zappi) all meet this requirement.

How to apply for the grant

Landlords do not apply to OZEV directly. The process runs through an OZEV-authorised installer. Here is how it works:

  1. 01
    Get a site survey
    An OZEV-authorised installer visits the property to assess the electrical supply, parking layout, and cable routes. They produce a quote that itemises eligible and ineligible costs.
  2. 02
    Review and approve the quote
    The installer confirms which costs qualify for the grant and what your net payment will be. The grant is deducted upfront — you do not pay full price and claim back later.
  3. 03
    Installer submits the grant application
    Before work starts, the installer submits the grant application to OZEV on your behalf. They need: your property ownership evidence, the site address, and a declaration that the property is used for residential rental.
  4. 04
    Installation and certification
    Once the grant is approved, the work is completed. You receive an Electrical Installation Certificate, the chargepoints are commissioned, and OZEV pays the installer the grant amount directly.

Typical turnaround from survey to installation is 3–6 weeks, depending on the size of the project and grant processing time. Larger housing association projects may take longer due to procurement and site access coordination.

EV Infrastructure Grant vs Workplace Charging Scheme

Landlords sometimes confuse the EV Infrastructure Grant with the Workplace Charging Scheme (WCS). They are separate schemes for different property types:

EV Infrastructure Grant (Landlords)Workplace Charging Scheme
Property typeResidential rental (BTL, HMOs, housing association)Non-residential (offices, car parks, retail)
Who benefits from chargersTenantsEmployees, fleet, visitors
Grant rate75% up to £600/socket, £30k/site75% up to £350/socket
ApplicationVia OZEV-authorised installerVia OZEV-authorised installer
Can they be combined?No — one scheme per installationNo — one scheme per installation

If you own a property that is both residential and commercial (such as a flat above a shop), the grant that applies depends on which parking spaces the chargers will serve. See our workplace EV charging guide for more on the WCS.

Common questions

The EV Infrastructure Grant for Landlords and Housing Providers is an OZEV-administered grant that covers 75% of the eligible costs of installing EV charging infrastructure at residential rental properties. The grant is capped at £600 per socket and £30,000 per site. It is specifically designed for private landlords and housing providers installing chargers for tenants, and covers both the electrical infrastructure (cable routes, distribution boards) and the chargepoints themselves.

Get a free quote for your rental property

Our OZEV-authorised installers handle landlord grant applications from site survey to installation. Free quote, no obligation.

Niko Moustoukas

Niko Moustoukas

Founder, Director · Drives a Tesla Model 3

Niko founded Power EV alongside EV Charge Cable, building both sites to cover the full home-charging picture: finding a qualified installer and getting the right cable for your car. The idea came from his own experience going through the process of getting a home charger fitted and realising how hard it was to find clear, unbiased information.

Meet the team