Who can install an EV charger: OZEV-approved installers, electricians and DIY

The Short Answer
You only need an OZEV-approved installer if you're claiming a grant: only they can claim the UK government grant for you, and Scotland's rural grant, which you claim yourself, needs an installer eligible with both OZEV and the Energy Saving Trust. Otherwise any electrician registered with a competent person scheme (a government-approved scheme, such as NICEIC or NAPIT, whose members can sign off their own work) can fit a home charger, and in England they certify the work themselves.
In England an unregistered electrician, or you, can legally do it too, but building control has to be told first (with the council, usually a building notice at least 2 days before work starts), and it checks the work, for a fee. We'd use a registered electrician: it's a new high-current circuit, and Hypervolt, for one, says its chargers must be installed by suitably qualified electricians.
Who can fit yours?
Pick who'd fit it, whether you're claiming a grant and where you live. See whether that works, and who signs the work off.
Can they fit it?
Yes
- They certify the work themselves and tell building control for you; the building regulations certificate must reach you within 30 days of the work finishing.
- Ask for the Electrical Installation Certificate for the new circuit, too.
- The network operator (the company that runs the local power network, not your energy supplier) must be told about the charger.
Three levels of installer
| Who | Who signs the work off (England) | Can claim the grant? |
|---|---|---|
| OZEV-approved installer | Usually they do, through their scheme; ask which one | Yes, the only installers who can |
| Electrician registered with a competent person scheme | They do, and the building regulations certificate must reach you within 30 days of finishing | No |
| Unregistered electrician | Building control checks it, after a building notice | No |
| You | Building control checks it, after a building notice | No |
What OZEV-approved means
OZEV is the Office for Zero Emission Vehicles, part of the Department for Transport and the Department for Energy Security and Net Zero, and it runs the chargepoint grants. An OZEV-approved (or authorised) installer is one it has authorised to claim those grants. To be authorised, an installer has to belong to a competent person scheme or the Electrical Contracting Association: for home chargers OZEV accepts NICEIC, NAPIT, SELECT, OFTEC and the ECA. OZEV may also check credit, fraud and customer feedback.
To stay on the list they must have claimed a grant within the past 2 years and stay in their scheme. When they fit a charger under the grant they must help you check you qualify, survey the site, fit a charger model on OZEV's approved list, test it, tell the network operator (the company that runs the local power network) in writing and give you an Electrical Installation Certificate to the wiring regulations, BS 7671. They mustn't charge you the grant before their claim is paid. Some firms are authorised as installer representatives instead: they subcontract the fitting and claim for it, and the electrician who fits it must be OZEV-approved too. And don't have the charger fitted until OZEV has approved your application.
Two old names still turn up. OLEV, the Office for Low Emission Vehicles, is now called OZEV, so "OLEV approved" is the same approval under the office's old name. EVHS, the Electric Vehicle Homecharge Scheme, was the home charger grant from 2014 to 2022; the EV chargepoint grant replaced it. Which grant you could get today: EV charger grants.
Can a normal electrician fit one?
Yes. If they're registered with a competent person scheme, in England they certify the work themselves and tell building control for you, and in England the building regulations certificate must reach you within 30 days of finishing. Competent person schemes have insurance-backed warranties and complaints procedures if something goes wrong. You can check an electrician on the Electrical Competent Person Register, which covers England and Wales.
An electrician who isn't registered can still fit it in England, but it goes through building control, like DIY. Either way, ask for the Electrical Installation Certificate for the new circuit, and make sure the network operator is told about the charger. If you qualify for a grant, they'd need to be OZEV-authorised too.
Can you install it yourself?
In England, legally, yes: a new circuit is notifiable building work, so building control has to be told first. With the council that's usually a building notice at least 2 days before you start; a private approver gives the council an initial notice instead. Building control checks the work. Councils base their fees on their costs. If the work doesn't comply with building regulations, the person who did it can be prosecuted and fined, and you could have to pay to put faulty work right. Without approval you won't have the certificates you may need when you sell. In Wales, Scotland or Northern Ireland, check with building control first.
We wouldn't. It's a new high-current circuit, and charger makers can insist on an electrician: Hypervolt, for one, says its chargers must be installed by suitably qualified electricians, following the wiring regulations (BS 7671) and the IET's code of practice, and registered within 48 hours or the warranty is void. What a professional installation involves: how a home charger is installed.
Common questions
Get a quote from a local installer
Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.
How we checked this
Every figure and rule on this page was checked against its source on 14 November 2026. We recheck them every month.
- Residential and commercial chargepoints: become an authorised installer (GOV.UK (OZEV), official; read 14 November 2026)
- Find an electric vehicle (EV) chargepoint installer (GOV.UK, official; read 14 November 2026)
- Building regulations approval: use a competent person scheme (GOV.UK, official; read 13 November 2026)
- Registered Competent Person Electrical: find or check an electrician (Electrical Competent Person Register, official; read 13 November 2026)
- Building regulations approval: when you need approval (GOV.UK, official; read 14 November 2026)
- Building regulations approval: how to apply (GOV.UK, official; read 14 November 2026)
- The Building Regulations 2010, regulation 12(6A): notifiable electrical work (England) (legislation.gov.uk, official; read 13 November 2026)
- The Building Regulations 2010, regulation 16: notice before starting work (England) (legislation.gov.uk, official; read 13 November 2026)
- The Building Regulations 2010, regulation 20: self-certification schemes (England) (legislation.gov.uk, official; read 13 November 2026)
- Office for Low Emission Vehicles (GOV.UK, official; read 14 November 2026)
- Grant schemes for electric vehicle charging statistics: 1 April 2026 (GOV.UK (DfT), official; read 14 November 2026)
- Home 3 Pro Installation Guide (Hypervolt, industry; read 14 November 2026)
- Connecting electric vehicles and heat pumps to the networks (Energy Networks Association, official; read 13 November 2026)
- Office for Zero Emission Vehicles (GOV.UK, official; read 14 November 2026)
- Electric vehicle chargepoint grants (GOV.UK (OZEV), official; read 14 November 2026)
- Electric vehicle chargepoint grant for renters or flat owners (GOV.UK, official; read 14 November 2026)
- Electric Vehicle Chargepoint Grant for Households with On-Street Parking (GOV.UK Find a grant, official; read 14 November 2026)
- Domestic charge point funding (Scotland) (Energy Saving Trust for Transport Scotland, official; read 14 November 2026)

Gavin Rogers
Director · Drives a BMW iX2
Gavin co-founded Power EV alongside EV Charge Cable, a specialist EV charging cable retailer. Between the two sites, the team covers the full home-charging picture: finding a qualified installer and getting the right cable to go with the charger.
Meet the team