EV chargers for business: what to fit, what it costs, and the grant

Niko Moustoukas
Niko Moustoukas · Founder, DirectorUpdated 14 November 2026
Get your free quote
Takes 2 mins

The Short Answer

For staff, fleet vehicles or hotel guests who park all day or overnight, we'd fit 7kW chargers: on our estimates about £1,500 to £4,500 a socket, fitted. Fit 22kW where cars stay a few hours and you have a three-phase supply, and rapid chargers (about £15,000 to £35,000 each) only where drivers stop for under an hour.

The Workplace Charging Scheme pays up to £500 a socket (75% of the cost at most) for up to 40 sockets, until 31 March 2027; state-funded schools get up to £2,000. A business can only use it for chargers its staff and fleet use, not customers. If you pay tax on profits, the cost of new charging equipment, less any grant, can come off your profits in the year you buy it.

Plan your site

Five questions, then the chargers we'd fit, our cost estimate, the grant and the rules that apply.

Who are you?
Who'll use the chargers?
How long do cars stay?
In England: is it a new building with more than 10 parking spaces (or a major renovation that brings in the same rule)?

We'd fit 6 7kW AC sockets: all day or overnight is long enough for most charging at 7kW, and it keeps the load on your supply down.

Our estimate: £9,000 to £27,000 fitted, before any grant (£1,500 to £4,500 a socket). Ask whether a quote includes VAT. Grid work, groundworks across a car park, software and maintenance usually cost extra.

Workplace Charging Scheme: up to £3,000 off (£500 a socket, or 75% of the cost if that's less, for all 6 sockets). Apply before any installation work starts.

If every socket ran flat out at once, that's 42kW, about 61 amps on the busiest phase, with single-phase chargers spread across a three-phase supply. Ask your installer how much spare capacity you have. If it's less, load management shares it between the chargers, and GOV.UK advises talking to your network operator early when you're fitting several.

The rules that apply

  • It has to be a smart charger: the smart charge point rules cover workplace chargers in Great Britain (not rapid or public ones).
  • Free charging for staff isn't a taxable benefit if it's open to all your staff at that workplace, and not offered through salary sacrifice.
  • If you pay tax on profits, new charging equipment qualifies for the 100% first-year allowance: its cost, less any grant, comes off your profits in the year you buy it, on spending up to 31 March 2027 (Corporation Tax) or 5 April 2027 (Income Tax).
  • Planning (England): a wall charger, or a charging post up to 2.7 metres high in a business car park, is usually permitted development, unless it's at a listed building or a scheduled monument.

7kW, 22kW or rapid?

Match the charger to how long cars stay. Faster chargers cost more and need a bigger supply, so don't fit more speed than people will use.

ChargerCharge time (GOV.UK, standard car battery)Our estimate, fittedWe'd fit it for
7kW AC3 to 8 hours (3 to 7kW)£1,500 to £4,500 a socketStaff, fleets, hotels: cars parked all day or overnight
22kW AC1 to 3 hours (7 to 22kW)£1,500 to £4,500 a socketShops, gyms, pubs, visitors: a few hours, on a three-phase supply
50kW rapid (DC)20 to 40 minutes£15,000 to £35,000 a chargerStops under an hour, on a busy route
150kW ultra-rapid (DC)15 to 30 minutes (100kW and up)£40,000 to £100,000 a chargerCharging hubs and big fleets, with a specialist

22kW only works on a 400V three-phase supply, and a car charges on AC only as fast as its own on-board charger allows: most new cars take up to 11kW, so they won't use the full 22kW. For cars parked overnight, GOV.UK's advice is that you may not need rapid chargers at all.

What it costs

On our estimates, a 7kW or 22kW charger costs £1,500 to £4,500 a socket fitted, a 50kW rapid (DC) charger £15,000 to £35,000, and an ultra-rapid one £40,000 to £100,000, before any grant. Ask whether a quote includes VAT. These usually cost extra:

  • work on your supply or a bigger connection from the network operator, which can cost more than the chargers;
  • digging across a car park for cables: about £500 to £3,000 a charger;
  • load management, so the chargers share your spare capacity: about £500 to £2,000;
  • back-office software for access, billing and reports: about £10 to £50 a charger a month;
  • a maintenance contract: about £100 to £300 a charger a year;
  • a contactless card reader, for public chargers of 8kW and above that you charge for: about £500 to £1,000 a charger.

Get each quote split into hardware, labour, supply work and groundworks, so you can compare them like for like.

Your supply and the network operator

The biggest unknown is your electricity supply. Your installer works out how much spare capacity you have. If you're fitting several chargers, GOV.UK advises talking to your network operator (the DNO) early.

Load management lets chargers share what you have instead of paying for a bigger connection. Each car gets as much as the capacity allows, and the total never goes over it:

Six 22kW chargers sharing 32kW of spare capacity through a load manager. With one car plugged in it gets the charger's full 22kW. With all six plugged in, each gets about 5.3kW.One car plugged inSpare capacity32kWLoadmanagerCar22kWFreeFreeFreeFreeFreeAll six in useSpare capacity32kWLoadmanagerCar5.3kWCar5.3kWCar5.3kWCar5.3kWCar5.3kWCar5.3kW
The Energy Saving Trust's example: six 22kW chargers on a site with 32kW of spare capacity. One car gets the full 22kW; with all six in use, each gets about 5.3kW. A car may also take less than the charger offers.

If you do need a new or bigger connection, the network operator quotes in 5 to 65 working days, depending on its size, and you have 90 days to accept. Since 1 April 2023 you don't pay for reinforcing the wider network, only for the equipment that serves your site, so the cost depends on how much power you need and how far you are from the network. A small connection to a cable in the street can take a few weeks; a very large one can take months or years.

GOV.UK's ways to keep the connection cost down:

  • free up capacity you already have (energy efficiency, or moving heavy use to other times);
  • fit slower chargers if cars stay overnight;
  • ask the network operator about a flexible or time-profiled connection, or a new connection to another part of the site;
  • use smart chargers to manage when cars charge.

Grants and tax

The Workplace Charging Scheme pays up to 75% of the cost of buying and installing chargers, VAT included, capped at £500 a socket and 40 sockets across all your sites, until 31 March 2027. It's for businesses, charities, public sector organisations and small accommodation businesses anywhere in the UK (not the Channel Islands or the Isle of Man). What you need:

  • off-road parking that's clearly part of your premises and designated to you, and the owner's permission if it isn't yours;
  • for a business, chargers for your staff and fleet only (you can let local residents use them out of hours); charities, public bodies and small accommodation businesses can let anyone use them;
  • an OZEV-authorised installer, and a charger on OZEV's approved commercial list, with a 3-year on-site warranty;
  • chargers that aren't required anyway, by the building regulations or a planning condition.

Have the site surveyed, then apply online. You'll get a voucher within 5 working days if you're approved. Nothing can be fitted before then, and the installer has to fit the chargers and claim within 180 days. They take the grant off your invoice. An employer can also use it for a charger at an employee's home, for a company vehicle that can't be charged at work.

The scheme step by step: the Workplace Charging Scheme.

GOV.UK's application page still says £350 When we checked on 14 November 2026, the "apply" page on GOV.UK still said £350 a socket. The scheme's own page and OZEV's guidance say £500 for chargers fitted from 1 April 2026, whenever you applied.

State-funded schools and colleges have their own version: up to £2,000 a socket, 75% of the cost at most, for up to 40 sockets, and anyone can use the chargers. Landlords have a grant of their own: see EV charger grants.

Tax. New charging equipment qualifies for a 100% first-year allowance, so its cost, less any grant, comes off your taxable profits in the year you buy it, on spending up to 31 March 2027 for Corporation Tax or 5 April 2027 for Income Tax. Free charging at work isn't a taxable benefit for your staff if it's open to all your staff (or all of them at that workplace), and not offered through salary sacrifice. Charging at an employee's home isn't covered by that.

Opening your chargers to the public

Chargers the public can use come under the Public Charge Point Regulations, even if the charging is free, and even in a car park only for your customers or guests, such as a supermarket or hotel. Workplace chargers that are never open to the public don't. Depending on the charger, you (or the operator you sign up with) have to:

  • show the full price in pence per kWh;
  • run a free, staffed 24/7 helpline;
  • let drivers pay through at least one roaming provider, and share open data on the chargers;
  • take contactless if you charge for it: on public chargers of 8kW and above put in after 24 November 2024, and on every one of 50kW and above;
  • for rapid chargers, keep reliability at 99% on average across your network, and publish it.

If you run the chargers yourself as a micro-business, only the pricing rule applies to you. Chargers for staff or fleet only have to be smart chargers instead: the smart charge point rules cover workplace chargers in Great Britain, but not rapid or public ones.

Planning, building regulations and fire safety

Planning (England). In a car park, a wall-mounted charger (within size limits), or a charging post up to 2.7 metres high (one per space), is usually permitted development, so it doesn't need planning permission. Not at a listed building or a scheduled monument. Equipment housing on the ground is allowed too, within limits: no more than 45 cubic metres in all, 3 metres high, and at least 5 metres from a road and 10 metres from homes.

Building regulations (England). A new non-residential building with more than 10 parking spaces needs a charger for one space and cable routes for at least a fifth of the rest. A major renovation brings the same rule in if the work includes the car park or its electrics. If the charger and cable routes would cost more than 7% of the renovation, the charger isn't needed, but the cable routes still are, unless they alone cost more than 7%. The grant can't pay for what the rules require.

Fire safety. Update your fire risk assessment when you put chargers in. GOV.UK publishes fire safety guidance for covered car parks.

By sector

SiteWhat we'd fitGrant and rules
Offices and workplaces7kW for staff who park all dayWorkplace Charging Scheme; free staff charging is tax-free if it's open to all staff
Hotels and B&Bs7kW for overnight guestsSmall accommodation businesses can get the grant and let guests use the chargers. Chargers in a hotel car park count as public, so the public charging rules apply
Shops, cafes, pubs and gyms22kW for stays of a few hours, on three-phaseNo grant for customer parking. Public charging rules apply, even in a customers-only car park
Fleets and depots7kW or 22kW for overnight, with load managementWorkplace Charging Scheme, including chargers at drivers' homes for company vehicles; talk to the network operator early
Schools and colleges7kW for staffState-funded: up to £2,000 a socket. Independent schools use the main scheme
GP surgeries and public sector sites7kW for staff, 22kW for visitorsPublic bodies can get the grant and let anyone use the chargers; a GP practice run as a business, staff and fleet only. Visitor chargers come under the public charging rules
Flats and rented homes7kWThe landlord grant

How it works, step by step

  1. 01
    Decide who'll use the chargers
    Staff, fleet, guests or the public: it decides the grant, the rules and the charger.
  2. 02
    Get a site survey
    An installer checks your supply, where the chargers and cables can go, and whether you need load management or the network operator.
  3. 03
    Apply for the grant
    If you qualify, apply online before any installation work starts. The voucher lasts 180 days.
  4. 04
    Installation
    By an OZEV-authorised installer if you're using the grant. They take the grant off your invoice and claim it.
  5. 05
    Set it up
    Access, pricing and payment in the back-office software, and the public charging rules if the public can use them.
  6. 06
    Keep it running
    A maintenance contract, and an updated fire risk assessment.

Running charging for staff (free or paid, tax and VAT, a charging policy): workplace charging.

Common questions

On our estimates, £1,500 to £4,500 a socket fitted for a 7kW or 22kW charger, £15,000 to £35,000 for a 50kW rapid (DC) charger and £40,000 to £100,000 for an ultra-rapid one, before any grant. Supply work, groundworks, software and maintenance usually cost extra.

Get a free quote for your site

Tell us about your site and how many chargers you need, and a local installer will be in touch with a free quote. No obligation.

How we checked this

Every figure and rule on this page was checked against its source on 14 November 2026. We recheck them every month.

Niko Moustoukas

Niko Moustoukas

Founder, Director · Drives a Tesla Model 3

Niko founded Power EV alongside EV Charge Cable, building both sites to cover the full home-charging picture: finding a qualified installer and getting the right cable for your car. The idea came from his own experience going through the process of getting a home charger fitted and realising how hard it was to find clear, unbiased information.

Meet the team