Part S building regulations: EV charge points in new builds, explained

The Short Answer
In England, a new house or block of flats with parking has to come with a charge point, one for each home with a parking space, under Part S of the Building Regulations: for building work notified to building control from 15 June 2022, or started from 15 June 2023. The official guidance asks for at least 7kW and an untethered socket (a tethered one only in exceptional cases), so you'll probably need your own charging cable. Covered car parks get cable routes instead, ready for a charger later, and if the average cost of connecting each charge point to the grid would top £3,600, the developer fits as many as that allows and cable routes for the rest.
If your new build has no charger, it may have been built under the old rules: Part S doesn't apply where the plans went to building control before 15 June 2022 and work began before 15 June 2023. Scotland has had its own rule since 5 June 2023. Wales hadn't made one when we checked in November 2026.
Does your building need a charge point?
Tell us about the building and its parking, and see what the rules ask for: a charge point, cable routes for one later, or nothing.
What the rules ask for
Yes: a charge point for each home with parking
- Each home with parking gets a charge point for one space (if there are fewer spaces than homes, every space gets one), and the official guidance asks for at least 7kW and an untethered socket (a tethered one only in exceptional cases), so you'll probably need your own charging cable.
- If the average cost of connecting each charge point to the grid would top £3,600, the developer fits as many as that allows, and cable routes for the rest.
What Part S asks for
Part S is England's building regulation for EV charging, with the detail in regulations 44D to 44K and the official guidance in Approved Document S. It only applies where there's parking within the building's site boundary for the people who live or work there, or their visitors. A major renovation means work on more than 25% of the building's outer surface (walls, floor, roof, windows, doors, roof windows and roof-lights).
| Building work | Charge points | Cable routes for later |
|---|---|---|
| New homes (S1) | One parking space per home; every space if there are fewer spaces than homes | The other spaces, where there are more than 10 spaces and more spaces than homes |
| Homes made by converting a building (S2) | At least one space per new home | Spaces the existing supply can't take |
| Major renovation of a residential building with more than 10 spaces afterwards (S3) | At least one space per home | Every other space |
| New non-residential building with more than 10 spaces (S4) | One | At least one in 5 of the rest |
| Major renovation of a non-residential building with more than 10 spaces afterwards (S5) | One | At least one in 5 of the rest |
Mixed-use buildings follow the home rules for the flats and their parking, and the non-residential rules for the rest (S6). A cable route is a safe, clear path from the power supply to where a charger would go, for the cabling to be installed in the future.
The charge point itself, in the guidance's words, should:
- have a rated output of at least 7kW;
- have a universal socket, so it's untethered; a tethered charger may be acceptable in exceptional cases, such as a self-build where the car is already known;
- show its charging status with lights or a display;
- run on its own dedicated circuit, and meet BS 7671 (the wiring regulations) and the IET's code of practice for EV charging.
The regulations themselves set the minimum: a reasonable power output for each space, a dedicated circuit, and compatibility with any vehicle that may use it. Charge points sold for home or workplace use in Great Britain also have to be smart, under the separate smart charge point rules.
The exemptions, and why some new builds have no charger
- Started under the old rules. Part S doesn't apply where a building notice, initial notice or full plans (the ways a builder tells building control, or an approved inspector, about the work) went to building control before 15 June 2022 and the work started before 15 June 2023. It goes by each notice, so plots on the same estate can differ. So a home finished well after 2022 can still be on the old rules, if its building work started in time.
- Grid connection costs. For new homes, the developer fits as many charge points as it can at an average connection cost of £3,600 or less each, and cable routes in the rest. The connection cost is the extra cost of upgrading the electricity supply, not the charger or building work, and the government's FAQs say a high cost doesn't mean no charge points at all.
- Covered car parks. Spaces under a roof (not a carport or a home's own garage) get cable routes rather than charge points; spaces outside are used first.
- Conversions and renovations. Charge points are only needed if the work includes the car park or its electrics; for homes made by conversion or a residential renovation, also only as many as the existing supply can take without an upgrade. For a renovation, if charge points and cable routes would cost more than 7% of the work, no charge points are needed, only cable routes (in every space for a residential building, at least one in 5 for other buildings), unless those alone would cost more than 7%; a residential renovation done mainly to make the walls or roof fire-safe is exempt.
- No parking on the site. No requirement.
- Planning conditions. Whatever the building regulations say, a planning permission can require charge points as a condition, so check yours.
Scotland, Wales and Northern Ireland
Part S applies in England only. Scotland has its own standard, 7.2, in force since 5 June 2023: every building must be designed and built so that provision for charging electric vehicles is made where its parking is within the building or its grounds; the detail is in Scotland's building standards technical handbooks. If the building warrant was applied for before then, ask the council's building standards service which standards applied. It doesn't cover non-domestic buildings with 10 or fewer spaces, or alterations and extensions other than major renovations.
Wales consulted on adding charge points to its building regulations for new homes, new non-residential buildings and some renovations and conversions (6 September 2024 to 29 November 2024), and its consultation page now shows a summary of responses (last updated 7 August 2026). When we checked on 15 November 2026, no Welsh regulation requiring them had been made. Northern Ireland isn't covered by Part S; we haven't checked its own building regulations, so ask your council's building control.
Moving in: what to check
- Which space the charge point serves, and that it reaches your car's charging port.
- That you have the charger's app login and manual, and the electrical certificate for the circuit.
- A charging cable for your car, if the charger is untethered (the guidance asks for untethered unless there's an exceptional reason): Type 2 charging cables.
- An EV tariff, which we'd set up before your first charge. What charging at home costs.
For offices, shops and other non-residential buildings: EV charging for business.
Common questions
No charger on your new build?
Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.
How we checked this
Every figure and rule on this page was checked against its source on 15 November 2026. We recheck them every month.
- The Building Regulations 2010, Schedule 1 Part S (legislation.gov.uk, official; read 15 November 2026)
- The Building Regulations 2010, Part 9B: infrastructure for the charging of electric vehicles (regulations 44D to 44K) (legislation.gov.uk, official; read 15 November 2026)
- The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021, regulation 4: transitional provision (legislation.gov.uk, official; read 15 November 2026)
- Approved Document S: infrastructure for the charging of electric vehicles (GOV.UK (MHCLG), official; read 15 November 2026)
- Approved Document S: frequently asked questions (GOV.UK, official; read 15 November 2026)
- The Building (Scotland) Regulations 2004, Schedule 5, standard 7.2: electric vehicle charging (legislation.gov.uk, official; read 15 November 2026)
- Electric vehicle charging in residential and non-residential buildings (consultation) (Welsh Government, official; read 15 November 2026)
- Regulations: electric vehicle smart charge points (GOV.UK (OPSS), official; read 14 November 2026)
- Workplace Charging Scheme (GOV.UK Find a grant (OZEV), official; read 15 November 2026)
- The Building (Scotland) Amendment (No. 2) Regulations 2022, regulation 5: transitional provision (legislation.gov.uk, official; read 15 November 2026)

Niko Moustoukas
Founder, Director · Drives a Tesla Model 3
Niko founded Power EV alongside EV Charge Cable, building both sites to cover the full home-charging picture: finding a qualified installer and getting the right cable for your car. The idea came from his own experience going through the process of getting a home charger fitted and realising how hard it was to find clear, unbiased information.