The Short Answer

Fitting a home charger is quick: a standard installation takes about 2 to 4 hours. The waiting is before that: Octopus says most of its installations go ahead within 4 to 6 weeks of the quote, a little longer in Scotland and South West England. Network work adds to that: if your home's maximum demand with the charger added is above 60 and up to 100 amps, the installer applies first; below 100 amps the network operator answers within 10 working days once it has everything it needs.

For a standard installation you need off-street parking, a solid wall for the charger and a clear cable route from your fuse box. The installer checks your supply and earthing, fits a new circuit with its own protection, mounts and tests the charger and sets up the app with you. Leave it to a qualified electrician: in England a new circuit is notifiable building work, and the paperwork comes with the job.

How long will yours take?

Answer what you know about your home and see the steps between booking and charging, with how long each one takes.

Your home's maximum demand with the charger added

Your installer works this out from your supply, your appliances and the charger.

Is your supply shared with a neighbour (looped)?
Claiming a grant?
The job

From quote to charging

Often 4 to 6 weeks

The fitting itself is the quick part. The weeks are finding an installer and booking a date.

  1. 1

    Quote to installation day

    Often 4 to 6 weeks

    It depends on the installer: Tesla says finding one and booking can take up to 2 weeks; Octopus says most of its installations go ahead within 4 to 6 weeks of the quote, a little longer in Scotland and South West England, and longer if network work is needed. Quotes start with photos of your fuse box, meter and parking, or a survey visit.

  2. 2

    Network operator

    Maybe

    Your installer works out your maximum demand. Above 60 and up to 100 amps they apply first, and below 100 amps the answer comes within 10 working days once the network operator has everything it needs; at some operators (SSEN, for example), at 60 amps or less, with no safety concerns and a supply that isn't looped, they can fit it and notify afterwards.

  3. 3

    Installation day

    About 2 to 4 hours

    A standard install: a solid wall, a short cable route and an easy-to-reach fuse box. Octopus suggests keeping the whole day free.

  4. 4

    Paperwork

    England: within 30 days

    In England, a registered installer's building regulations certificate must reach you within 30 days.

Waits are as the installers, grant schemes and network operators publish them. The rule to apply first up to 100 amps is the Energy Networks Association's, and its answer within 10 working days applies below 100 amps once the operator has everything it needs; the notify-afterwards and looped-supply rules are SSEN's, as an example.

The installation, step by step

  1. 01
    Quote and survey
    Expect to send photos of your fuse box, electricity meter and where you park, or to have a survey visit. That's how the installer spots extra work before quoting.
  2. 02
    Grant approval, if you're claiming one
    Wait for the grant to be approved before anything is fitted.
  3. 03
    The network operator
    The installer works out your home's maximum demand with the charger added. Above 60 and up to 100 amps they apply before fitting it; below 100 amps the network operator answers within 10 working days once it has everything it needs. At SSEN, for example, at 60 amps or less, with no safety concerns and SSEN's other criteria met, they can fit it and notify afterwards. A looped supply, shared with a neighbour, is checked first.
  4. 04
    Installation day
    The installer checks your earthing and bonding, fits the charger and its protection, runs the cable, tests everything and sets up the app with you.
  5. 05
    The paperwork
    In England, a registered installer certifies the work themselves and you get the building regulations certificate within 30 days. Keep it with the electrical certificate for the new circuit. Elsewhere in the UK, ask your installer how they'll certify the work.
A standard installation: the supply comes in through the network operator's cut-out and main fuse, then your energy supplier's meter, then your consumer unit with a new RCBO for the charger. A cable runs through the wall to the charger outside, with an earth rod if the installer's checks call for one.Inside your homeOutsideCut-out andmain fuseThe networkoperator'sMeterYour energysupplier'sConsumer unitNew RCBOCableSmart chargerEarth rod,if needed
What a standard installation connects: up to about 10 metres of cable from your consumer unit to a 7kW smart charger on an outside wall. The cut-out and main fuse are the network operator's and the meter is your energy supplier's; your installer's work starts after the meter.

When the network operator has to approve it first

Maximum demand with the charger added: up to 60 amps, usually fit then notify; 60 to 100 amps, apply first, answer within 10 working days below 100 amps once the operator has everything it needs; over 100 amps, apply first and work may be needed.Fit, then notify

Up to 60A, no safety concerns, not looped (SSEN, for example)

Apply first

Answer within 10 working days below 100A, once they have all they need

Apply first

SSEN, for example; work may be needed first

0A60A100AYour home's maximum demand with the charger added (amps)
How the network operator gets involved. Your installer works out the maximum demand; a looped (shared) supply is checked first whatever the figure. A charger with load limiting that holds your home at 60 amps or less while it charges counts as 60 amps or less.

Maximum demand is the most power your home could draw at once, with the charger added. Your installer works it out, counting any load limiting: if the home already uses more than 60 amps but a charger with load limiting holds it at 60 amps or less while it charges, and the supply has no other issues, the Energy Networks Association's process lets the installer fit it and notify afterwards. Network operators never refuse a connection, but some homes need work first, such as splitting a looped supply or a bigger main fuse. In Great Britain a bigger fuse or unlooping is usually free for a typical household supply (up to 23kVA); in Northern Ireland, ask your installer about network charges.

What your home needs

What's needed
ParkingOff-street parking, such as a driveway or garage. With only on-street parking, a permanent cross-pavement channel and the council's permission
A wallA solid wall or permanent structure for the charger, such as brick or a garage wall
Cable routeA clear route from your meter and fuse box to the charger. Pod's standard installation covers up to 15m; other installers' standard lengths vary, and our cost guide assumes about 10m
Fuse boxEasy to reach, with room for a new circuit, or a separate small one fitted for the charger
PowerA dedicated circuit: Tesla, for example, recommends 32 amps for its charger, which gives 7.4kW on a single-phase supply
EarthingChecked by the installer; some homes need an earth rod for the charger
PermissionIf you rent or live in a flat, the owner's or freeholder's permission
Extra work Digging a trench, a long cable run through the house or a fuse box upgrade aren't part of a standard installation and are quoted separately. What they cost: EV charger installation costs.

Can you install it yourself?

We wouldn't. It's a new circuit carrying 32 amps for hours at a time, and in England it's notifiable building work: without a registered installer, building control has to be told at least 2 days before work starts. Grants also need an approved installer.

Who's allowed to fit one: who can install an EV charger.

Common questions

The fitting takes about 2 to 4 hours for a standard installation. Keep the day free in case it runs on. From quote to installation day is often 4 to 6 weeks with Octopus, longer if network approval or work is needed.

Get a quote for a home charger

Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.

How we checked this

Every figure and rule on this page was checked against its source on 14 November 2026. We recheck them every month.

Niko Moustoukas

Niko Moustoukas

Founder, Director · Drives a Tesla Model 3

Niko founded Power EV alongside EV Charge Cable, building both sites to cover the full home-charging picture: finding a qualified installer and getting the right cable for your car. The idea came from his own experience going through the process of getting a home charger fitted and realising how hard it was to find clear, unbiased information.

Meet the team