Charging an electric car without a driveway

The Short Answer
If you can park on the street outside your home, ask your council about a cable channel across the pavement. It lets you charge from a charger on your house, at home electricity prices. Since 21 October 2026 it no longer needs planning permission in most of England, and the on-street grant pays 75% of the cost of buying and installing the charger, up to £500. Never trail a loose cable across the pavement.
Otherwise, use on-street chargers such as lamp posts (ubitricity's standard rate is 56p per kWh), chargers at work, or public chargers where you shop. They cost more than charging at home, but the government plans to cut prices at chargers near homes from spring 2027.
Your options and what they cost
A few questions, then whether a charger at home with a channel across the pavement could work for you, what it costs, and what you'd pay a year to charge each way.
A charger at home with a cable channel across the pavement could work, if your council allows them. Ask your council first: it decides whether one can go in outside your home.
Since 21 October 2026, a channel put in by or with the permission of your highway authority doesn't need planning permission, and nor does one charger on your wall within the planning limits. Up front, a channel costs from £1,199 with VAT (Kerbo Charge's starting price; your council sets the final one), plus the charger: from about £1,599 to £1,999 in all, if the on-street grant pays 75% of buying and installing the charger, up to £500. Some councils add a yearly fee.
| Where you charge | A year |
|---|---|
| At home on an EV tariff (from 6.5p) | £145 |
| At home at today's price cap rate (26.32p, Great Britain) | £587 |
| Lamp-post charger overnight (45p) | £1,003 |
| Lamp-post charger, standard rate (56p) | £1,248 |
| Public rapid, October 2026 average (82p) | £1,827 |
Against charging at a lamp post overnight (45p), a channel and charger on an EV tariff would pay for themselves in at least 1.9 years to 2.3 years: longer if your council's price is higher or it charges a yearly fee.
Yearly costs are for the energy the battery takes in; you pay for a little more. The EV tariff rate is its lowest, for up to 6 hours every 24 hours, and needs a compatible car or charger. Lamp-post prices are ubitricity's pay-as-you-go: 45p from midnight to 7am, 67p from 4pm to 8pm, and from 38p in the Shell app. The price cap rate is for October to December 2026 and changes each quarter.
Every option, ranked
About 32% of homes in England (8 million) have no off-street parking. Here's how we'd rank the ways to charge without one, most convenient for most people first.
| Option | Cost to charge | Good for | Watch out for |
|---|---|---|---|
| Cable channel across the pavement, with a home charger | Your home rate: from 6.5p on an EV tariff | Parking outside your home at least once a week | Council permission; up-front cost; it doesn't reserve the space |
| Charging at work | Up to your employer; free charging at work isn't taxed if it's open to all staff and not through salary sacrifice | Commuters | Only if your employer has chargers |
| On-street and lamp-post chargers | ubitricity: 45p overnight to 67p at peak pay-as-you-go, from 38p in the Shell app | Overnight near home | Slower; a space may not be free |
| A neighbour's home charger (sharing apps) | Set by the host | Streets with a willing host | You book a slot |
| Supermarket and car park chargers | About 54p average under 50kW | Topping up while you shop | Time limits |
| Rapid hubs | About 82p average | A quick top-up | The dearest on average |
Cross-pavement charging: how it works
A channel is cut into the pavement, flush with the surface. When you charge, the cable from a charger on your house sits in the channel, so nobody trips on it. You take it out when you've finished. Some systems instead run a permanent cable under the pavement to a bollard at the kerb.
- 01Check your council's policyThe decision is your highway authority's: your council (in two-tier areas, usually the county council). Some run their own scheme or approve particular suppliers. It works best if you can park outside your home at least once a week.
- 02Get a surveyThe council or supplier checks the pavement: how wide it is, what it's made of, cables and pipes underneath, and things like double yellow lines or a nearby junction.
- 03Get the permissionsIn England and Wales, usually the highway authority's consent under section 178 of the Highways Act, and a street works licence unless the council or its contractor installs it. Some suppliers, such as Kerbo Charge, apply for you. On a private road, ask the landowner instead. If you rent or own a leasehold flat, get your landlord's or freeholder's permission too.
- 04Have a home charger fittedBy a qualified electrician, on the wall facing the street. For the on-street grant, use an installer approved by OZEV and apply before the work. Some councils want the charger's electrical certificate before you use the channel.
- 05Have the channel installedThen follow your council's terms: take the cable in when you're not charging, don't run it across the road, and don't put out cones or signs to keep the space.
What it costs
Kerbo Charge, one channel maker, starts at £999 plus VAT (£1,199 with VAT), including the survey, the council permissions and installation; the council sets the final price, which can be higher. Some councils run their own schemes with an up-front fee or a subscription, and some charge a yearly fee after a few years for maintenance.
Then the charger: a standard installation is about £900 to £1,300 on our estimates, less the on-street grant of 75% of the cost of buying and installing it, up to £500. You may also need public liability insurance (your home insurance may cover it). If your supply is shared with a neighbour's (looped) or needs a bigger main fuse, the network operator sorts it, usually free in Great Britain.
More on charger installation costs and the grant.
The new rule from 21 October 2026
Searches for “the new driveway rule” are about this change in England. Since 21 October 2026:
- a cable channel put in by, or with the permission of, the highway authority doesn't need planning permission, unless it's in a conservation area, within the curtilage of a listed building (the land that goes with it) or at a scheduled monument;
- a charger on the wall of a house or block of flats no longer needs a parking space next to it. Away from a parking space, it's one charger and not in a conservation area. It's never allowed within the curtilage of a listed building (the land that goes with it) or at a scheduled monument;
- where the cable crosses a pavement, it has to go through an approved channel;
- the charger can be no bigger than 0.2 cubic metres or higher than 1.6 metres;
- on a wall next to the pavement, the charger can stick out no more than 0.2 metres and must leave at least 1.5 metres of pavement.
The government says the change saves up to £300. It's also consulting, until 16 December 2026, on a clearer, quicker route for tenants and leaseholders to get a charge point.
Can you run a cable across the pavement?
Not a loose one. In England and Wales, section 162 of the Highways Act 1980 makes it an offence to put a wire across a highway in a way likely to cause danger, unless you've taken all necessary steps to warn people. Councils give consent for channels under section 178 of the same Act. A trailing cable is a trip hazard, especially for people with limited mobility or sight.
Cable covers and mats that sit on top of the pavement are up to your council, and they don't count for the on-street grant, which needs a permanent cross-pavement solution (a channel, or a permanent cable under the pavement). The grant and the wall-charger planning rule are for a dedicated charger, not a 3-pin socket, so check what your council's channel terms allow.
Lamp-post and on-street chargers
There were 41,927 on-street public chargers in the UK at the end of October 2026, many in lamp posts and bollards. They're slow, so they suit charging overnight. You usually bring your own Type 2 cable; ubitricity's take payment by scanning a QR code.
ubitricity, which runs mostly lamp-post chargers, charges 45p per kWh from midnight to 7am, 56p at standard times and 67p from 4pm to 8pm, or from 38p in the Shell app. Its smart charging pauses over the 4pm to 8pm peak (not on its faster 7kW to 22kW points). Where smart charging isn't available, it charges a flat 54p, and prices can differ at some chargers.
From spring 2027, the government plans to spend £100 million over 2 years (details to come) to cut prices at lower-powered public chargers near homes, saving around £150 a year for drivers who rely on them. To ask for a charger on your street, contact your council.
How to use and pay for them: public EV charging.
The on-street grant
If the street is your only parking, the government pays 75% of the cost of a home charger, up to £500, until 31 March 2027. You must own or rent the home and live there, have an eligible car, have adequate parking on the street, and have the highway authority's permission for a permanent cross-pavement solution (and planning permission if it's needed). It pays towards buying and installing the charge point, and it can't be claimed for work already done.
If you own a house with its own driveway, there's no grant. Renters and flat owners with their own parking can get the other home grant.
Councils trying it
Government guidance lists council trials. Milton Keynes maintains its approved channels for 3 years, after which the homeowner pays a yearly fee or the council may remove the channel. In Nottinghamshire, a pilot paid for by the government's Local EV Infrastructure fund aims to fit up to 300 channels, with 161 in by July 2026; householders pay for their own charger. Kerbo Charge says it is live or trialling in 55 council areas.
Scotland, Wales and Northern Ireland
The planning rules and the council process above are England's (the Highways Act covers England and Wales). Road works are run differently in each nation: in Scotland the roads authority decides, Wales has Transport for Wales's EV infrastructure team, and Northern Ireland has its Department for Infrastructure. The on-street grant covers all four nations.
Common questions
Get a quote for a home charger
If your council allows a cable channel outside your home, you'll need a home charger fitted by a qualified electrician. A local installer will be in touch with a free quote. No obligation.
How we checked this
Every figure and rule on this page was checked against its source on 14 November 2026. We recheck them every month.
- Cross-pavement solutions for charging electric vehicles (GOV.UK (DfT and OZEV), official; read 14 November 2026)
- Drivers to save up to £300 when installing EV chargers at home, as government slashes unnecessary red tape (GOV.UK (DfT), official; read 14 November 2026)
- The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026, article 7: Part 9 Class F, cross-pavement solutions (legislation.gov.uk, official; read 14 November 2026)
- The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2 Part 2 Class D, as amended 21 October 2026 (legislation.gov.uk, official; read 14 November 2026)
- Highways Act 1980, section 162: penalty for placing rope, etc. across highway (legislation.gov.uk, official; read 14 November 2026)
- Electric Vehicle Chargepoint Grant for Households with On-Street Parking (GOV.UK Find a grant, official; read 14 November 2026)
- Electric vehicle chargepoint grants (GOV.UK (OZEV), official; read 14 November 2026)
- Cutting electric vehicle charging costs (Budget 2026) (GOV.UK (HM Treasury), official; read 14 November 2026)
- Kerbo Charge cost and installation pricing (Kerbo Charge, industry; read 14 November 2026)
- Pricing for ubitricity-operated charging stations (ubitricity (Shell Recharge), industry; read 14 November 2026)
- VAT rates (GOV.UK, official; read 14 November 2026)
- EV charging statistics (Zapmap, industry; read 14 November 2026)
- How do you pay for electric car charging on the public network? (Zapmap, industry; read 14 November 2026)
- Zapmap Price Index (Zapmap, industry; read 15 November 2026)
- Charging electric vehicles (Energy Saving Trust, official; read 14 November 2026)
- EIM01035: charging facilities at or near the employee's workplace (HMRC, official; read 15 November 2026)
- Energy price cap unit rates and standing charges (Ofgem, official; read 15 November 2026)
- Intelligent Octopus Go (Octopus Energy, industry; read 15 November 2026)
- A beginner's guide to charging an electric vehicle (Zapmap, industry; read 14 November 2026)
- Do I need my own charging cable? (Zapmap, industry; read 13 November 2026)

Niko Moustoukas
Founder, Director · Drives a Tesla Model 3
Niko founded Power EV alongside EV Charge Cable, building both sites to cover the full home-charging picture: finding a qualified installer and getting the right cable for your car. The idea came from his own experience going through the process of getting a home charger fitted and realising how hard it was to find clear, unbiased information.
Meet the team