EV charger installation in Leeds: the council's rules, the pavement channel pilot and your options

The Short Answer
If you park on the street in Leeds, you can't run a charging cable across the pavement at any height or connect your own cable or charger to a lamp post. The one approved way is a channel set into the pavement from Kerbo Charge, under Leeds City Council's 12-month pilot that started on 5 December 2025 and is due to end in early December 2026. It costs £1,313.84 to start (£63.84 for a survey and £1,250 to fit, with an extra fee in rare, complex cases), then £4.99 a month from month 25, plus your home charger. Check you can still apply.
With a driveway or garage, it's a standard installation: Leeds is on Northern Powergrid's network, and your installer deals with it; it says a bigger fuse, if you need one, is free in most cases. Leeds had 138.3 public chargers per 100,000 people in July 2026, fewer than the UK's 174.9.
Can you charge at home in Leeds?
Pick where you park. See your options in Leeds, what they cost where there's a price, and what help there is.
Charging at home in Leeds
Through the council's pavement channel pilot, due to end in early December 2026
- Leeds doesn't let you run a cable across the pavement at any height, on or under the ground, or connect your own cable or charger to a lamp post.
- The one approved way is a channel set into the pavement, from Kerbo Charge, under a 12-month pilot that started on 5 December 2025. The council expects to bring in other products afterwards, but when we read its page on 15 November 2026 it didn't say whether you can still apply after early December 2026.
- The pavement must be adopted highway (not a private street), you need to be able to park outside and reach a ground-floor power supply, the council recommends no more than 10 metres to the car, and the cable must never cross the road. If you can't park outside at least once a week, the council says a channel probably isn't for you.
- It costs a £63.84 survey fee, then £1,250 to fit (including the council's £349.68 licence), then £4.99 a month for repairs from month 25 (rare, complex installations can cost more). Your home charger is extra.
- The government's on-street grant can pay 75% up to £500 towards buying and installing your home charger, until 31 March 2027, if you own or rent and live in the home, have no private, exclusive off-street parking (a driveway, garage or residential car park) but adequate on-street parking, have an eligible electric car (or one on order), and are fitting a permanent cross-pavement solution (not cable covers or mats) with the council's consent. It goes through an OZEV-approved installer, and if you're eligible OZEV emails you with instructions on starting installation, so wait for that.
No driveway: Leeds's pavement channel pilot
Leeds City Council says that in a home with no driveway, like many of the city's back-to-back and terraced houses, you can't run a cable across a public footpath, on, under or above the ground, put a charge point on the footpath or connect to a lamp post. Since 5 December 2025 it has allowed one exception: a cable channel recessed into the pavement, fitted by Kerbo Charge, the only approved product for the 12-month pilot. The council expects to bring in other products after the pilot, through a procurement exercise, but when we read its page on 15 November 2026 it didn't say whether you can still apply after early December 2026.
| Cost | Amount |
|---|---|
| On-site survey (non-refundable, paid through Kerbo Charge) | £63.84 |
| Channel, fitted, including the council's highway licence | £1,250 (licence £349.68) |
| To start, in all (the council says rare, complex installations can cost more) | £1,313.84 |
| Repairs cover, from month 25 | £4.99 a month |
| Your home charger | Separate, with an earth spike (a rod driven into the ground for the charger's own earth) or a charger with built-in protection against a supply earth fault |
- The channel can only go in pavement that's part of the publicly adopted highway (looked after by the council), so the pilot doesn't cover private or unadopted streets.
- You need to be able to park outside your house and reach a ground-floor power supply. The council recommends no more than 10 metres from outside your house to the car, and the cable must never cross the road.
- The channel takes a Type 2 cable up to 20mm thick.
- If you can't park outside your house at least once a week, the council says a channel probably isn't for you.
With a driveway: Northern Powergrid
Northern Powergrid runs the local power network across the North East, Yorkshire and northern Lincolnshire, Leeds included. Your installer checks your home has the capacity, notifies Northern Powergrid of the charger, and applies to it if you need a bigger fuse, which it says is free in most cases. What a standard installation costs and includes: EV charger installation. The steps and how long they take: how a home charger is installed.
Public charging in Leeds
Leeds had 138.3 public chargers per 100,000 people in July 2026, against 174.9 across the UK. Ranked by chargers per head, highest first, that's 181st of 361 council areas (our count from ONS's table). The council is putting charge points in many of its own car parks, is developing a policy to bring on-street charging to more people, and is supporting the West Yorkshire Combined Authority's work on a regional plan for more public chargers.
What public charging costs, network by network: public EV charging cost.
Common questions
Get a free quote in Leeds
Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.
How we checked this
Every figure and rule on this page was checked against its source on 15 November 2026. We recheck them every month.
- Electric vehicle charging in Leeds (Leeds City Council, official; read 15 November 2026)
- Electric Vehicles (Northern Powergrid, official; read 15 November 2026)
- About Northern Powergrid (Northern Powergrid, official; read 15 November 2026)
- Essential cable upgrade in Stourton, Leeds to enhance network reliability (Northern Powergrid, official; read 15 November 2026)
- Public electric vehicle chargers, per 100,000 population (Explore local statistics) (ONS (Department for Transport data, sourced from Zapmap), official; read 15 November 2026)
- Electric Vehicle Chargepoint Grant for Households with On-Street Parking (GOV.UK Find a grant, official; read 14 November 2026)
- Electric vehicle chargepoint grant for renters or flat owners (GOV.UK, official; read 14 November 2026)
- Drivers to save up to £300 when installing EV chargers at home, as government slashes unnecessary red tape (GOV.UK (DfT), official; read 14 November 2026)
- The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026, article 7: Part 9 Class F, cross-pavement solutions (legislation.gov.uk, official; read 14 November 2026)