EV charger installation in Leeds: the council's rules, the pavement channel pilot and your options

Graham Dodd
Graham Dodd · DirectorUpdated 15 November 2026
Get your free quote
Takes 2 mins

The Short Answer

If you park on the street in Leeds, you can't run a charging cable across the pavement at any height or connect your own cable or charger to a lamp post. The one approved way is a channel set into the pavement from Kerbo Charge, under Leeds City Council's 12-month pilot that started on 5 December 2025 and is due to end in early December 2026. It costs £1,313.84 to start (£63.84 for a survey and £1,250 to fit, with an extra fee in rare, complex cases), then £4.99 a month from month 25, plus your home charger. Check you can still apply.

With a driveway or garage, it's a standard installation: Leeds is on Northern Powergrid's network, and your installer deals with it; it says a bigger fuse, if you need one, is free in most cases. Leeds had 138.3 public chargers per 100,000 people in July 2026, fewer than the UK's 174.9.

Can you charge at home in Leeds?

Pick where you park. See your options in Leeds, what they cost where there's a price, and what help there is.

Where do you park?

Charging at home in Leeds

Through the council's pavement channel pilot, due to end in early December 2026

  • Leeds doesn't let you run a cable across the pavement at any height, on or under the ground, or connect your own cable or charger to a lamp post.
  • The one approved way is a channel set into the pavement, from Kerbo Charge, under a 12-month pilot that started on 5 December 2025. The council expects to bring in other products afterwards, but when we read its page on 15 November 2026 it didn't say whether you can still apply after early December 2026.
  • The pavement must be adopted highway (not a private street), you need to be able to park outside and reach a ground-floor power supply, the council recommends no more than 10 metres to the car, and the cable must never cross the road. If you can't park outside at least once a week, the council says a channel probably isn't for you.
  • It costs a £63.84 survey fee, then £1,250 to fit (including the council's £349.68 licence), then £4.99 a month for repairs from month 25 (rare, complex installations can cost more). Your home charger is extra.
  • The government's on-street grant can pay 75% up to £500 towards buying and installing your home charger, until 31 March 2027, if you own or rent and live in the home, have no private, exclusive off-street parking (a driveway, garage or residential car park) but adequate on-street parking, have an eligible electric car (or one on order), and are fitting a permanent cross-pavement solution (not cable covers or mats) with the council's consent. It goes through an OZEV-approved installer, and if you're eligible OZEV emails you with instructions on starting installation, so wait for that.

No driveway: Leeds's pavement channel pilot

Without a driveway in Leeds: Cable across the pavement: not allowed (Not at any height, on or under the ground); Your own cable or charger to a lamp post: not allowed (The council's rule for homes without a driveway); Pavement channel (Kerbo Charge): allowed (Pilot from 5 December 2025, due to end early December 2026); Public chargers: allowed (Including council car parks). Public chargers per 100,000 people, July 2026: Leeds 138.3, UK 174.9.NoCable across the pavementNot at any height, on or under the groundNoYour own cable or charger to a lamp postThe council's rule for homes without a drivewayYesPavement channel (Kerbo Charge)Pilot from 5 December 2025, due to end early December 2026YesPublic chargersIncluding council car parksPublic chargers per 100,000 people, July 2026Leeds138.3UK174.9
Options for homes without off-street parking in Leeds, and public chargers per 100,000 people from ONS (Department for Transport figures from Zapmap, official statistics in development). Ranked by chargers per head, highest first, Leeds is 181st of 361 council areas (our count from ONS's table). Official statistics in development are new figures ONS is still refining.

Leeds City Council says that in a home with no driveway, like many of the city's back-to-back and terraced houses, you can't run a cable across a public footpath, on, under or above the ground, put a charge point on the footpath or connect to a lamp post. Since 5 December 2025 it has allowed one exception: a cable channel recessed into the pavement, fitted by Kerbo Charge, the only approved product for the 12-month pilot. The council expects to bring in other products after the pilot, through a procurement exercise, but when we read its page on 15 November 2026 it didn't say whether you can still apply after early December 2026.

CostAmount
On-site survey (non-refundable, paid through Kerbo Charge)£63.84
Channel, fitted, including the council's highway licence£1,250 (licence £349.68)
To start, in all (the council says rare, complex installations can cost more)£1,313.84
Repairs cover, from month 25£4.99 a month
Your home chargerSeparate, with an earth spike (a rod driven into the ground for the charger's own earth) or a charger with built-in protection against a supply earth fault
  • The channel can only go in pavement that's part of the publicly adopted highway (looked after by the council), so the pilot doesn't cover private or unadopted streets.
  • You need to be able to park outside your house and reach a ground-floor power supply. The council recommends no more than 10 metres from outside your house to the car, and the cable must never cross the road.
  • The channel takes a Type 2 cable up to 20mm thick.
  • If you can't park outside your house at least once a week, the council says a channel probably isn't for you.
The grant and planning The government's on-street grant can pay 75% up to £500 towards buying and installing your home charger, until 31 March 2027, if you own or rent and live in the home, have no private, exclusive off-street parking (a driveway, garage or residential car park) but adequate on-street parking, have an eligible electric car (or one on order), and are fitting a permanent cross-pavement solution (not cable covers or mats) with the council's consent. It goes through an OZEV-approved installer, and if you're eligible OZEV emails you with instructions on starting installation, so wait for that. On planning, the council's page still says there are no permitted development rights for on-street charging, and recommends a planning application or a letter of comfort (a letter saying it won't take action). Since 21 October 2026, in England, a pavement channel authorised by the council doesn't need planning permission, except in a conservation area, within the grounds of a listed building or at a scheduled monument. The charger on your wall has its own rules, so ask the council which apply. The wider picture: charging without a driveway.

With a driveway: Northern Powergrid

Northern Powergrid runs the local power network across the North East, Yorkshire and northern Lincolnshire, Leeds included. Your installer checks your home has the capacity, notifies Northern Powergrid of the charger, and applies to it if you need a bigger fuse, which it says is free in most cases. What a standard installation costs and includes: EV charger installation. The steps and how long they take: how a home charger is installed.

Public charging in Leeds

Leeds had 138.3 public chargers per 100,000 people in July 2026, against 174.9 across the UK. Ranked by chargers per head, highest first, that's 181st of 361 council areas (our count from ONS's table). The council is putting charge points in many of its own car parks, is developing a policy to bring on-street charging to more people, and is supporting the West Yorkshire Combined Authority's work on a regional plan for more public chargers.

What public charging costs, network by network: public EV charging cost.

Common questions

No. Leeds City Council doesn't allow a cable across a public footpath at any height, on or under the ground. The only approved way is a Kerbo Charge channel set into the pavement, under its pilot from 5 December 2025, due to end in early December 2026.

Get a free quote in Leeds

Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.

How we checked this

Every figure and rule on this page was checked against its source on 15 November 2026. We recheck them every month.

Graham Dodd

Graham Dodd

Director · Drives a Volkswagen ID. Buzz

Graham co-founded Power EV and EV Charge Cable with the aim of removing the guesswork from home EV charging. Getting a charger fitted and choosing the right cable are closely linked decisions, and running both sites lets the team give joined-up advice on both.

Meet the team