EV charger installation in Birmingham: lamp-post chargers, the pavement question and your options

The Short Answer
If you park on the street in Birmingham, the council's on-street offer is lamp-post chargers: it says 560 Shell Recharge chargers have been installed in lamp posts on residential streets. At ubitricity's standard prices, that's 45p per kWh (a kWh is a unit of electricity) from midnight to 7am and 67p from 4pm to 8pm, though prices can differ by charger.
The council's electric vehicle web pages don't say whether you can run a cable or fit a channel across the pavement. A freedom of information request asking about it should normally get a reply by early December 2026. Whatever the answer, you need the council's consent before anything goes across the pavement, so ask it first. With a driveway, it's a standard installation, and your installer should handle National Grid's form (check your postcode).
Can you charge at home in Birmingham?
Pick where you park. See your options in Birmingham, what they cost where there's a price, and what help there is.
Charging at home in Birmingham
Unclear: not covered on the council's web pages, but lamp-post chargers
- When we checked in November 2026, Birmingham City Council's electric vehicle web pages didn't say whether you can run a cable or fit a channel across the pavement. A freedom of information request asking exactly that was made on 4 November 2026, and the council should normally reply by early December 2026.
- By law, a cable across the pavement needs the consent of the highway authority (the council, for roads it looks after; where a road isn't adopted by it, GOV.UK's guidance says the landowner), whatever the council's answer, so we'd ask through its Highways General Enquiry form first.
- The government's on-street grant needs that consent for a permanent cross-pavement solution (such as a channel set into the pavement), so for now it depends on the council's answer. What the grant offers:
- The government's on-street grant can pay 75% up to £500 towards buying and installing your home charger, until 31 March 2027, if you own or rent and live in the home, have no private, exclusive off-street parking (a driveway, garage or residential car park) but adequate on-street parking, have an eligible electric car (or one on order), and are fitting a permanent cross-pavement solution (not cable covers or mats) with the council's consent. It goes through an OZEV-approved installer, and if you're eligible OZEV emails you with instructions on starting installation, so wait for that.
- Meanwhile, the council says 560 Shell Recharge chargers have been installed in lamp posts on residential streets; ubitricity's standard price is 45p per kWh from midnight to 7am, though it can differ by charger.
No driveway: lamp posts, and the pavement question
The council's charging network page (last updated September 2025) says it partnered with Shell Recharge, and 560 chargers have been installed in existing lamp posts on residential streets, prioritising parts of the city where people can't charge at home. ubitricity, part of the Shell group, operates them; find your nearest on its website or on Zapmap. A helpdesk, open 24 hours a day, handles faults and billing.
| When | Price per kWh |
|---|---|
| Midnight to 7am | 45p |
| 7am to 4pm, and 8pm to midnight | 56p |
| 4pm to 8pm | 67p |
| Chargers where smart charging isn't available (one flat rate) | 54p |
These are ubitricity's standard prices across its network when we checked in November 2026. It says prices may differ on some chargers, so check the charger or app before you start. It charges no connection fee, and you don't need a subscription (Shell offers an optional paid one).
On running your own cable or fitting a channel across the pavement, the council's electric vehicle web pages said nothing when we read them on 15 November 2026. On 4 November 2026, someone asked the council directly under the Freedom of Information Act whether it allows a channel or cable across the pavement, what it charges, and whether it's running or planning a trial. It should normally reply by early December 2026 (WhatDoTheyKnow gives 3 December 2026), and we'll put its answer here.
The council's charging plan
For charging hubs, the council's network page (last updated September 2025) puts first the areas with heavy local traffic, places people visit, homes that rely on street parking, and taxi ranks. It says residential chargers for overnight charging will be prioritised where there's little or no off-street parking, and areas with little spare grid capacity and little or no off-street parking will get "innovative on-street charging solutions".
In July 2026, Birmingham had 135.2 public chargers per 100,000 people, below the UK's 174.9; ranked by chargers per head, highest first, the city is 192nd of 361 council areas (our count from ONS's table). Other networks' prices: public EV charging cost.
With a driveway: National Grid
The Energy Networks Association's postcode finder gives National Grid ED (West) for the city centre; check your own postcode. National Grid Electricity Distribution's online form either applies to connect a charger or notifies it of one already fitted; it gets back to you with next steps within 10 working days, and may need to arrange work such as a fuse upgrade. Your installer should fill it in. When, and the steps around it: how a home charger is installed.
- There's no government grant for a house you own with its own parking space.
- If you rent, the government grant can pay 75% up to £500 towards buying and installing the charger, until 31 March 2027, if you have an eligible electric car (or one on order) and your landlord's permission; the work has to wait until OZEV (the government's Office for Zero Emission Vehicles) approves your application.
Prices for a standard fitted charger: EV charger installation.
Common questions
Get a free quote in Birmingham
Tell us about your home and where you park, and a local installer will be in touch with a free quote. No obligation.
How we checked this
Every figure and rule on this page was checked against its source on 15 November 2026. We recheck them every month.
- City-wide EV charging network (Birmingham City Council, official; read 15 November 2026)
- Highways general enquiries (Birmingham City Council, official; read 15 November 2026)
- Cross-pavement EV charging channels: policy, fees and applications (FOI request to Birmingham City Council) (WhatDoTheyKnow, official; read 15 November 2026)
- Pricing for ubitricity-operated charging stations (ubitricity (Shell Recharge), industry; read 14 November 2026)
- Domestic EV (National Grid Electricity Distribution, official; read 15 November 2026)
- Who's my electricity network operator? (Energy Networks Association, official; read 15 November 2026)
- Public electric vehicle chargers, per 100,000 population (Explore local statistics) (ONS (Department for Transport data, sourced from Zapmap), official; read 15 November 2026)
- Cross-pavement solutions for charging electric vehicles (GOV.UK (DfT and OZEV), official; read 14 November 2026)
- Electric Vehicle Chargepoint Grant for Households with On-Street Parking (GOV.UK Find a grant, official; read 14 November 2026)
- Electric vehicle chargepoint grant for renters or flat owners (GOV.UK, official; read 14 November 2026)
- The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026, article 7: Part 9 Class F, cross-pavement solutions (legislation.gov.uk, official; read 14 November 2026)

Graham Dodd
Director · Drives a Volkswagen ID. Buzz
Graham co-founded Power EV and EV Charge Cable with the aim of removing the guesswork from home EV charging. Getting a charger fitted and choosing the right cable are closely linked decisions, and running both sites lets the team give joined-up advice on both.
Meet the team